1. Install and operate machine:
Implementation of other steps below:
- Put in place dry, cool. Since the sure
- Turn of(Off) all CBs and switch, before connected to the input/output sources.
- Connect input battery, addition to "Battery DC" with the correct voltage on the machine. Special attention must be connected correctly every positive(+)/negative(-) battery to the (+)/(-) of the machines. If connected incorrectly will cause extreme fails - break to DC fuse(found to be only true value terms - if incorrect, manufacturer will not be liable warranty for free).
- The exposure to constrict tighten carefully and ensure the correct size wire required (not from here to accu machines too long to avoid loss)
- After checking the correct connection, in the boot order as follows:
§ Close CB supplys DC power for battery.
§ Switch on to boot machine(ON/OFF).
§ Check electricity charging curent on a DC amp meter(if any)
2. Note:
- LED status report battery charger (Boosting/Floating).
§ Red Boosting.
§ Floating blue.
- If the power is too high will break fuse(AC Fuse). In this case we have to find true value terms - if incorrect manufacturer will not be liable warranty for free.